Entire application process timeline?
Moderators: sky's the limit, sepia, Sulako, lilfssister, North Shore, I WAS Birddog
Re: Entire application process timeline?
Really appreciated to have those informations.
So hum what about the b1900 pilots? Are they going to get the Q and classic spots ? Which would mean no OTS at all until summer at least?
So hum what about the b1900 pilots? Are they going to get the Q and classic spots ? Which would mean no OTS at all until summer at least?
Re: Entire application process timeline?
All that is correct.rudder wrote: ↑Wed Jan 30, 2019 1:54 pmIf the contract amendment is approved, the participating GGN pilots would get seniority spots on the Jazz Pilot Seniority List that equate to their Date of Hire at GGN as a pilot.
Therefore, participating GGN pilots would be bidding as Jazz pilots to fill vacancies. Accordingly, participating GGN pilots take precedence over all pilots not yet hired by Jazz (OTS).
OTS hiring would continue as migrating participating GGN pilots and the CRJ200’s to Jazz will take several months. But likely OTS hiring will slow during that period.
Information we do not yet have is, assuming the OS is ratified, the planned timeline to transfer the planes from GGN to Jazz and by extension. It is safe to suppose that GGN will gradually wind down it's operation vs xfering all 12 planes in 1 fell swoop ergo creating a huge GGN Pilots bottle neck. It is far more realistic to expect that over the integration period, there will be vacancies in NH classes to be filled with OTS while the xfering GGN Pilots are still engaged in the wind down operation at GGN.
In other words, if the integration is progressive enough, there may not be enough GGN pilots to fill all the classes leaving some room for OTS.
Disclaimer: Pure speculation on my part.
58
Re: Entire application process timeline?
Unknown how many GGN pilots are interested in coming to Jazz. All are eligible. Participating GGN pilots will bid with their seniority to Jazz vacancies. Not restricted by former equipment type. Not grandfathered on to CRJ. Rumour is that some GGN pilots (that are deemed qualified) will be headed straight to AC prior to Jazz transfer. This question is best posed and answered in a GGN pilot thread.
There are OTS in Jazz February GS. OTS hiring will likely to continue but at a rate that is yet to be determined.
- KenoraPilot
- Rank 8
- Posts: 902
- Joined: Fri Nov 04, 2005 2:34 pm
- Location: 'berta
Re: Entire application process timeline?
The flow of pilots from GGN will be metered out throughout the year as their planes (RJ200) slowly come over to Jazz. I would "assume" there will be a few spots per GS for OTS. Again speculation though at best, will find out tomorrow if the TA passes (possibly Friday)
-
- Rank 1
- Posts: 16
- Joined: Mon Nov 05, 2018 6:39 pm
Re: Entire application process timeline?
TA passed. Anyone knows what would happen to those who are in the hiring pool?
-
- Rank 7
- Posts: 561
- Joined: Thu Jan 27, 2005 7:55 pm
Re: Entire application process timeline?
Hang tight. The equipment bid was delayed due to the TA. From what I'm hearing the bid should be out in the next 2 weeks.
Cheers,
Flyer
Cheers,
Flyer
-
- Rank 0
- Posts: 7
- Joined: Tue May 28, 2019 12:07 pm
Re: Entire application process timeline?
Any update from this?yycinformer wrote: ↑Tue May 15, 2018 6:08 pmNo specific date, only "July" and thanks!emilybrooke787 wrote: ↑Mon May 14, 2018 2:50 pmI heard the June GS was full, did they give July Ground school date? Im just waiting back for a call now..yycinformer wrote: ↑Thu May 03, 2018 12:19 pm Update - got a call this morning. 2 weeks from hitting submit to call, had 2 internal references. they're only running one gs a month, June is full.
- KenoraPilot
- Rank 8
- Posts: 902
- Joined: Fri Nov 04, 2005 2:34 pm
- Location: 'berta
Re: Entire application process timeline?
2 GS in June
1 GS in July (just added a week ago)
Starting in Aug GS will have GGN pilots (not sure if 100% or just a portion)
*this will again be dependant on the 737Max fiasco
Rumour is 737Max back in Oct
1 GS in July (just added a week ago)
Starting in Aug GS will have GGN pilots (not sure if 100% or just a portion)
*this will again be dependant on the 737Max fiasco
Rumour is 737Max back in Oct
- KenoraPilot
- Rank 8
- Posts: 902
- Joined: Fri Nov 04, 2005 2:34 pm
- Location: 'berta
Re: Entire application process timeline?
up coming GS:
1x July
1x Aug
2x Sept
3x Oct
Then likely every 2 weeks
1x July
1x Aug
2x Sept
3x Oct
Then likely every 2 weeks
Re: Entire application process timeline?
Do you know if it is going to be GGN pilots or a mix?KenoraPilot wrote: ↑Sat Jul 20, 2019 12:08 pm up coming GS:
1x July
1x Aug
2x Sept
3x Oct
Then likely every 2 weeks
- KenoraPilot
- Rank 8
- Posts: 902
- Joined: Fri Nov 04, 2005 2:34 pm
- Location: 'berta
Re: Entire application process timeline?
Babar350 wrote: ↑Sat Jul 20, 2019 2:37 pmDo you know if it is going to be GGN pilots or a mix?KenoraPilot wrote: ↑Sat Jul 20, 2019 12:08 pm up coming GS:
1x July
1x Aug
2x Sept
3x Oct
Then likely every 2 weeks
Word on the street Aug forward will likely be mostly GGN. Whether its 100% GGN I do not know.
- kingskate8
- Rank 1
- Posts: 21
- Joined: Fri May 24, 2019 11:47 am
Re: Entire application process timeline?
Good day everyone Just did a sim eval yesterday (Aug7th) just wondering how long before they call you if you pass the sim eval then move on for the medical and then job offer thanks!
Re: Entire application process timeline?
Depends on you experience.
Do you have 704 multi time ?
Do you have 704 multi time ?
- KenoraPilot
- Rank 8
- Posts: 902
- Joined: Fri Nov 04, 2005 2:34 pm
- Location: 'berta
Re: Entire application process timeline?
After the SIM Eval the call for Medical should come quickly if you "passed" the sim eval. Once you pass the medical then its a waiting game, likely you'll go into the pool for an undetermined amount of time. Frustrating as it is, HR seems to have their own formula for when and who they choose.kingskate8 wrote: ↑Thu Aug 08, 2019 10:40 am Good day everyone Just did a sim eval yesterday (Aug7th) just wondering how long before they call you if you pass the sim eval then move on for the medical and then job offer thanks!
Good luck!
- kingskate8
- Rank 1
- Posts: 21
- Joined: Fri May 24, 2019 11:47 am
Re: Entire application process timeline?
Yes i do! 704 multi turbine time.
- kingskate8
- Rank 1
- Posts: 21
- Joined: Fri May 24, 2019 11:47 am
Re: Entire application process timeline?
Roger thanks man!KenoraPilot wrote: ↑Thu Aug 08, 2019 11:27 amAfter the SIM Eval the call for Medical should come quickly if you "passed" the sim eval. Once you pass the medical then its a waiting game, likely you'll go into the pool for an undetermined amount of time. Frustrating as it is, HR seems to have their own formula for when and who they choose.kingskate8 wrote: ↑Thu Aug 08, 2019 10:40 am Good day everyone Just did a sim eval yesterday (Aug7th) just wondering how long before they call you if you pass the sim eval then move on for the medical and then job offer thanks!
Good luck!
Re: Entire application process timeline?
You most probably won't even be placed in a pool. Expect a call within 2 weeks.
- kingskate8
- Rank 1
- Posts: 21
- Joined: Fri May 24, 2019 11:47 am
Re: Entire application process timeline?
Got an email today for medical and backround check!
Re: Entire application process timeline?
kingskate what was your wait time from interview to getting a call back to book a sim eval? Was it the 2 weeks the HR departments states it takes?kingskate8 wrote: ↑Fri Aug 09, 2019 1:30 pmGot an email today for medical and backround check!
- kingskate8
- Rank 1
- Posts: 21
- Joined: Fri May 24, 2019 11:47 am
Re: Entire application process timeline?
Applied online on June 25th then waited 2 weeks for a phone call,Interviewed July 29th, Invite for Sim Eval August 2nd, Did the Sim eval in YYC August 7th, Got an email today August 9th for Medical and Background Check and confirmed if they can start contacting my references.RILEY wrote: ↑Fri Aug 09, 2019 1:53 pmkingskate what was your wait time from interview to getting a call back to book a sim eval? Was it the 2 weeks the HR departments states it takes?